Flordeliz Guest House

03092011960.JPG

Flordeliz Guest House Construction Photos

March 2013 - Page 10

Flordeliz Guest House Construction - Page 1

Flordeliz Guest House Construction - Page 2

Flordeliz Guest House Construction - Page 3

Flordeliz Guest House Construction - Page 4

Flordeliz Guest House Construction - Page 5

Flordeliz Guest House Construction - Page 6

Flordeliz Guest House Construction - Page 7

Flordeliz Guest House Construction - Page 8

Flordeliz Guest House Construction - Page 9

Flordeliz Guest House Construction - Page 11

Flordeliz Guest House Construction - Page 12

Flordeliz Guest House Construction - Page 13

Flordeliz Guest House Construction - Page 14

Flordeliz Guest House Construction - Page 15

Flordeliz Guest House Construction - Page 16

Flordeliz Guest House Construction - Page 17

Flordeliz Guest House Construction - Page 18

Flordeliz Guest House Construction - Page 19

Flordeliz Guest House Construction - Page 20

Started construction on the 20m x 10m Flordeliz Guest House in December 2010. This is the 10th page starting in March of 2013. Click on the links above to see the earlier pictures.

PhilFlagMediumEmbossed.gif

Week of March 8, 2013

The 8-foot high concrete block fence around the beach property continues construction. Three sides have been completed, including the front and back gate areas. The fence on the ravine side is 3/4 complete now.

The first row photos show the gate area with the pillar tops finished. The red flexible conduit on the pillar tops is for the lights. There will be LED lights (low cost) on all the front side pillars and then every so often on the other sides. There will also be about 10-12 CCTV cameras on the walls. This technology has gotten very inexpensive in the Philippines. The forms on on the pillar tops on the north side fence. The south side fence is about 3/4 done - from front fence to past the kitchen.

IMG_2259.JPG IMG_2260.JPG IMG_2261.JPG IMG_2262.JPG IMG_2267.JPG IMG_2268.JPG

The 2nd row of photos shows the area from the kitchen to the 2-story hut. The first 2 photos show the end of the "flat" section of the wall. From that point further, the steep drop in elevation requires that the fence steps down a row or so every 10 feet. This elevation change is the most obvious in the last photo.

IMG_2279.JPG IMG_2280.JPG IMG_2263.JPG IMG_2264.JPG IMG_2265.JPG IMG_2266.JPG

This row starts with a photo showing the ravine wall area down to where it bends towards the hut. The next 2 photos show the flat area near the hut that will become the patio. This small patio will be accessed by a rope suspension bridge from the hut entrance.

IMG_2269.JPG IMG_2270.JPG IMG_2271.JPG

The last row shows family and friends making good use of the coconuts that grow on the property. Every time we go there, we harvest some coconuts to drink the milk and to eat some of the coconut. What is being done here is to take the coconut meat and milk, add some sugar and real milk and copious amounts of orange drink. DANG, it IS GOOD !!!

IMG_2274.JPG IMG_2275.JPG IMG_2277.JPG IMG_2278.JPG



Week of Easter Sunday (03/30), 2013

The first row here shows the back gate area by the hut all the way around to the kitchen area. In these sections, the pillars are complete and the electrical conduit has been installed.

IMG_2281.JPG IMG_2282.JPG IMG_2283.JPG IMG_2284.JPG IMG_2285.JPG

This row of photos shows the fence detail along the path from the kitchen to the hut. The bottom of the 2nd photo shows the area where the suspension bridge will anchor. The 3rd photo shows the suspension bridge central support pillar under construction.

IMG_2289.JPG IMG_2288.JPG IMG_2287.JPG

These 2 photos show the new concrete ramp installed in the main gate area to be the base for the wrought iron gate. The ramp will probably be extended after the fence is totally completed.

IMG_2290.JPG IMG_2292.JPG