Flordeliz Guest House

Flordeliz Guest House Construction Photos
April 2013 - Page 11
Flordeliz Guest House Construction - Page 1
Flordeliz Guest House Construction - Page 2
Flordeliz Guest House Construction - Page 3
Flordeliz Guest House Construction - Page 4
Flordeliz Guest House Construction - Page 5
Flordeliz Guest House Construction - Page 6
Flordeliz Guest House Construction - Page 7
Flordeliz Guest House Construction - Page 8
Flordeliz Guest House Construction - Page 9
Flordeliz Guest House Construction - Page 10
Flordeliz Guest House Construction - Page 12
Flordeliz Guest House Construction - Page 13
Flordeliz Guest House Construction - Page 14
Flordeliz Guest House Construction - Page 15
Flordeliz Guest House Construction - Page 16
Flordeliz Guest House Construction - Page 17
Flordeliz Guest House Construction - Page 18
Flordeliz Guest House Construction - Page 19
Flordeliz Guest House Construction - Page 20
Started construction on the 20m x 10m Flordeliz Guest House in December 2010. This is the 11th page starting
in April of 2013. Click on the links above to see the earlier pictures.
April 4 & 6, 2013
The 8-foot high concrete block fence around the beach property continues construction. All four sides have been completed with
the exception of the area right next to the 2-story hut. The wall concrete work shall finish in April.
The first row photos show the main entrance gate area with wall to the right. The first photo shows the view through the main drive gate.
The walk-through gate is at the right of the driveway gate. The 2nd photo shows the wall area to the right of the main entrance.
The next 4 photos show the inside of that same area showing the fine finishing concrete installed in that area.
The 2nd row of photos shows the fence wall to the left of the main entrance. Note that the wall is shorter because there will be wrought iron fencing filling in the height to 8 feet.
The first 2 photos show the outside and the next 2 the inside of that wall section. The 5th and 6th photos show the view from the entrance gate into the property.
This row starts with 2 photos showing the wall going behind the kitchen and out to the walk going to the hut. The 3rd photo shows the view
back towards the main gate entrance from the hut. The next 2 photos show the north wall down to the hut. The last photo shows the wall next to the walk from the kitchen
to the hut.
This next row shows the fence that goes along the walk from the kitchen to the hut. The 4th photo again shows the pillar that will support the beam that will span the
gorge from the walkway wall to the wall on the beach side of the hut. The last photo shows where the beam will anchor to the end of the beach-side wall.
This row of photos shows the fence detail on the beach side of the hut. There will be wrought iron fencing in between the pillars so anyone on the hut 1st floor can
still see the beach area.
This row of photos starts with a photo of the beach wall from the 2nd story of the hut. The 2nd photo from the 2nd story shows the pillars will be taller than shown in earlier photos.
Construction is too difficult if we tried to pour the pillars that high in one step. The rest of the photos on this last row show the pillars as they are seen from the ground
floor of the hut and from the area in front of the hut.
AND....wrought iron works should start installation in about 2 more weeks. It will take several weeks to get it all installed. The first to be installed will be the 2 entrance gates
and the rear gate to go down the steps to the beach.
Back to Home